Ramona III towing the barge |
Removing part of the gangway so the boat will fit. |
Assembling the spreader bar |
Cradle alone going into the water
|
|
|
Positioning for the second try |
Coming out onto the barge
|
Set her down gently |
A little damage on bow of boat |
Back at the pier |
Coming aboard |
New boat cover for winter 2007-8 |
The base of the new boat house |
New boat house with base covered and door frame
|
|
|
The outside walls being framed |
|
|
The end truss being prepared for installation |
|
|
|
The roof and some siding plywood
|
|
Starboard aft repair |
Jim Mitchell working on exhaust deflector |
Repaired bow |
New beams aft |
Refurbished heat exchangers with new 'thru hull' fittings |
Tom Cates and Ron Moran working on repaired steering |
Jerry Gilmartin installing new zincs |
Ken Nissen and John Akin at repair shed inspecting work |
Rework near the rudders |
Rebuilt transom |
Rebuilt starboard aft |
Primer on bow |
Coat new wood with Smiths |
Metal roof and sides being installed on boat house
|
|
New electrical panel with transformer below CO's day bed by Tom Cates |
|
Final coat of red paint on bow
|
Further work on the boathouse |
|
|
|
|