Ramona III towing the barge |

Removing part of the gangway so the boat will fit. |

Assembling the spreader bar |

Cradle alone going into the water
|

|

|

Positioning for the second try |

Coming out onto the barge
|

Set her down gently |

A little damage on bow of boat |

Back at the pier |

Coming aboard |

New boat cover for winter 2007-8 |

The base of the new boat house |

New boat house with base covered and door frame
|

|

|

The outside walls being framed |

|

|

The end truss being prepared for installation |

|

|

|

The roof and some siding plywood
|

|

Starboard aft repair |

Jim Mitchell working on exhaust deflector |

Repaired bow |

New beams aft |

Refurbished heat exchangers with new 'thru hull' fittings |

Tom Cates and Ron Moran working on repaired steering |

Jerry Gilmartin installing new zincs |

Ken Nissen and John Akin at repair shed inspecting work |

Rework near the rudders |

Rebuilt transom |

Rebuilt starboard aft |

Primer on bow |

Coat new wood with Smiths |

Metal roof and sides being installed on boat house
|

|

New electrical panel with transformer below CO's day bed by Tom Cates |

|

Final coat of red paint on bow
|

Further work on the boathouse |

|
|
|
|